Diagnosis of construction management and constructability implementation in construction

Authors

  • Zulay Giménez Palavicini Universidad Centroccidental Lisandro Alvarado (Venezuela)
  • Carlos Suárez Isea Universidad Centroccidental Lisandro Alvarado (Venezuela)

DOI:

https://doi.org/10.4067/S0718-50732008000100001

Keywords:

constructability, management of the construction, implementation, planning, experience

Abstract

This paper presents research results diagnosing processes and performance of leading construction firms in Barquisimeto, Venezuela. Studied topics include: constructability application concepts, recognition of constructability barriers, top management recommendations to adopt the methodology, decision making process to lead program consolidation through change management. In addition, several internal aspects relative to construction firm management were analyzed, such as: scheduling and planning, construction difficulties, procurement, personnel characteristics, optimization process and technology implementation.

Downloads

Download data is not yet available.

Published

2008-04-03

How to Cite

Giménez Palavicini, Z., & Suárez Isea, C. (2008). Diagnosis of construction management and constructability implementation in construction. Revista Ingeniería De Construcción, 23(1), 4–17. https://doi.org/10.4067/S0718-50732008000100001

Issue

Section

Original Research